FURTHER upgrading of the road network for the new Domestic Terminal at Johannesburg International Airport (JIA) kicked off this week and will be in operation until mid next year according to Airports Company South Africa (Acsa). In a statement, Acsa explains that in addition to the frontage roads, roads in the area of the Engen Sky Stop need to be completely reconstructed in order to link the new terminal's two level frontage exit roads. In terms of this, traffic will be diverted from the Multi-Storey parkade down to the lower exit precinct. The points of exit from the airport have been identified on the relevant direction signs by additional panels displaying the words "Airport Exit". Acsa added that during the phase of construction, all destinations served by the R21 and R24 freeways would be reached by the same point of exit. However, those drivers wishing to go to Boksburg , the hotels or back to the airport would have to immediately move into the left lane as they turn out of the lower exit precinct. (Miguel de Sousa)
Acsa explains road upgrades at JIA
Comments | 0
© Now Media. This content is protected by copyright and may not be adapted or republished. If you would like to discuss cooperation opportunities, please contact: editor@travelnews.co.za.